New construction of a silo and mixing plant for milk powder
- 8 GRP silo cells of 60 m3 each on support legs for individual weighing in an industrial hall.
- Continuous silo ceiling with multi-layer panels
- Discharge by vibrating floor and frequency controlled dosing valves
- 2 upright mixers, each with a capacity of 25 t
New construction of a flour silo with batch mixers and filling cells
- 16 GRP silo cells á 60-120 m³
- 2 loading cells of GRP á 56 m³
- 2 mixers with sockets for 2 m³ on measuring boxes
- With weighing scales for small components, metal separator and control sieving boxes
- Complete supply including steel and roof structure with roofing